1588 North Dairy Road

The vision for the North Dairy project is a response to Saanich’s new Shelbourne Valley Action Plan which envisions a four storey multifamily building for the site. The approximately 0.7 acre site enjoys frontages on North Dairy Road, Wordsworth Street and Keats Street. The project benefits from its proximity to Hillside Mall, Cedar Hill Rec Centre, and numerous schools and institutions, as well as direct bus access to downtown and the University of Victoria.

The building design utilizes high quality materials, using a balance of brick cladding, white stucco, real cedar soffits and coloured accent panels to effectively break up massing of the building. The building also uses ground floor individual unit entrances, patios and layered landscaping along all three road frontages to create a visually interesting and vibrant pedestrian realm.

Abstract has engaged with local firms Low Hammond Rowe Architects and LADR Landscape Architects. To develop a plan that is responsive to the neighbourhood, the goals of Saanich and the needs of the region.

Status Rezoning and Development Permit in Process

Neighbourhood Shelbourne/Camosun

Location 1588 North Dairy Road

Contact Us 250.883.5579 kdasilva@abstractdevelopments.com

1588 North Dairy Road Timeline

We have re-submitted plans to the District of Saanich, we are excited about the changes and improvements to the project. Please click the links below for details on the changes and updated drawings: Summary of changes to the 1588 North Dairy proposal Boards from January 15th Open House

PROPERTY PLACED UNDER CONTRACT

DOOR-TO-DOOR INTRODUCTIONS WITH NEIGHBOURHOOD & NEIGHBOURHOOD CONSULTATION BEGINS (PRE-APPLICATION)

PRELIMINARY MEETING WITH ROCKLAND CALUC & DEVELOPMENT APPLICATION SUBMITTED TO CITY OF VICTORIA

COMMUNITY MEETING – CALUC

COMMUNITY MEETING – ADDITIONAL

COMMITTEE OF THE WHOLE #1 & PROJECT REDESIGN BASED ON COMMUNITY AND COUNCIL DIRECTION BEGINS

OPEN HOUSE- PROJECT REDESIGN TO NEIGHBOURHOOD

CALUC COMMUNITY MEETING – PRESENT REDESIGN

COMMITTEE OF THE WHOLE #2 & ADDITIONAL PROPOSAL REVISIONS BASED ON COMMUNITY AND COUNCIL DECISION BEGINS

COMMITTEE OF THE WHOLE #3

Contact Us

Complete the form below to receive updates on this development as they become available.

  • This field is for validation purposes and should be left unchanged.